Planning an EV Charging Car Park Layout
Short answer
Plan EV charging layouts around charger positions, cable reach and vehicle access before any groundworks. Allow for accessible bays following PAS 1899:2022, protect chargers with bollards, keep pedestrian routes clear and plan wayfinding for larger hubs. In England, Approved Document S requires charge points or cable routes for many new buildings. Mark bays only after charger bases and reinstatement are complete.
Start with the chargers
The layout of an EV charging area is driven by where chargers can go. Power supply, cable routes, groundworks costs and the position of existing kerbs and islands all influence charger positions. Once those are fixed, the bays need to be arranged so that every vehicle can reach a charger without cables trailing across walkways or other bays.
Talk to your charge point installer and line marking contractor together at the start. A short layout meeting, with a site plan, saves costly changes later.
Consider how vehicles will approach the chargers. Many cars have charge ports at the front or rear, so drivers may need to reverse into some bays and drive into others. Bays where both are possible, with charger positions that suit either, are more practical than layouts that force awkward manoeuvres. Signs or markings showing the best way to park can help at busy hubs.
- Agree charger positions and cable routes first.
- Check cable reach to front, rear and side charge ports.
- Plan bollards or barriers to protect chargers.
- Allow for accessible bays and their extra space.
- Keep pedestrian routes clear of cables and turning vehicles.
- Leave room to add more chargers later.
Bay sizes and arrangement
Charging bays often benefit from a little extra width and length compared with standard bays, because drivers need to walk around the vehicle with a cable, and chargers and bollards take up space at the head of the bay. Where space allows, slightly larger bays reduce damage to chargers and cars.
For accessible charging, PAS 1899:2022 sets out bay dimensions, kerbs, approach space and charger position. At least some bays at public sites should follow it, so disabled drivers can charge independently.
Think about vans and larger vehicles if your site serves a fleet. Electric vans need longer and sometimes wider bays, and drivers may need to reach charge ports at different heights. Mixing van bays with car bays without planning leads to vans overhanging walkways or blocking aisles.
| Layout element | Consideration |
|---|---|
| Standard EV bay | Extra space for cable handling if possible |
| Accessible EV bay | Follow PAS 1899:2022 dimensions and access |
| Charger position | Reachable without crossing other bays |
| Protection | Bollards or wheel stops that do not block access |
| Future bays | Ducts and space for expansion |
Building Regulations and new developments
In England, Approved Document S of the Building Regulations requires charge points or cable routes for many new residential and non-residential buildings and some major renovations with associated parking. If you are building or renovating, check what Approved Document S requires for your project, as it affects how many bays need chargers or cable routes from the start.
Planning conditions may also set requirements for EV charging and bay numbers. Check any conditions before finalising the layout, so the marked bays match what was approved.
Rules differ in Scotland and Wales, so check the local building standards there.
Wayfinding for larger hubs
On larger charging hubs, drivers need to find the charging area, choose a bay and leave again without confusion. Direction arrows, queuing lanes, pedestrian routes and bay numbering linked to each charger all help. A charging hub that is easy to navigate is used more and has fewer collisions with chargers.
Pedestrian safety matters because EV drivers often stay with or near their cars, walking to nearby shops or facilities. Mark walkways away from turning vehicles and keep sightlines clear around chargers.
Shelter and lighting improve the experience at larger hubs. Drivers may spend time at the charger, so a well-lit, sheltered area with clear routes to facilities makes the site more attractive. Keep canopy columns, signs and furniture out of the transfer zones and cable routes when finalising the layout.
Marking order and timing
Marking should come last. Charger installation usually involves trenching and building bases, which leaves reinstated strips across the surface. Marking over fresh or uneven reinstatement can cause cracking and early wear, so wait until the surface is sound. Old white lines that no longer fit the new layout should be removed, typically at £3–£8 per linear metre, so drivers are not confused.
Then apply the EV markings: green outlines from £25–£50 per bay, symbols at £45–£90 each, text at £60–£120 per bay or full green infills at £180–£350 per bay. Small jobs carry a minimum charge from about £300.
Planning for growth
Demand for charging is growing, so plan for more bays than you need today. Installing ducts to future bay positions during the first groundworks costs far less than digging up a finished car park later. Mark the first bays so that future ones can be added alongside without changing the whole layout.
Keep a plan of charger positions, ducts and marked bays. It makes future additions faster and helps contractors quote accurately.
Review the layout once it is in use. Watch where drivers struggle, where cables trail and whether bays are left empty or overused, then adjust markings and signs during the next refresh.
Questions people also ask
Does Approved Document S apply to existing car parks?
Approved Document S applies in England to many new residential and non-residential buildings and some major renovations with associated parking. It does not generally require charge points in existing car parks that are not part of such work. Check the document and any planning conditions for your specific project.
Where should EV chargers go in a car park?
Where power supply and cable routes are practical, and where every bay can reach a charger without cables crossing walkways or other bays. Consider charge port positions on different vehicles, protect chargers with bollards and allow space for accessible bays following PAS 1899:2022. Agree positions before groundworks start.
When should EV bays be marked during a charger project?
At the end, after charger bases, cable trenches and reinstatement are complete and the surface is sound. Old lines that no longer fit should be removed first. Marking earlier risks damage from groundworks and lines cracking over fresh patches.
Written and checked by the EV Bay Marking team. Read our editorial policy.
More guides
EV Bay Marking Cost UK: Prices Per Charging Bay
A green thermoplastic EV bay outline typically costs £25–£50 per bay in the UK in 2026. A preformed EV symbol adds £45–£90 and EV CHARGING ONLY text…
What Colour Should EV Charging Bays Be in the UK?
Green is the most widely used colour for EV charging bays in the UK, either as a green outline or a full green infill, often with a white or green…
Accessible EV Charging Bays: PAS 1899 Guide
PAS 1899:2022 is the British Standards Institution specification for accessible public charge points. It covers bay dimensions, kerbs, approach space…
How to Stop Non-Electric Cars Parking in EV Bays
The most effective way to stop non-electric cars using EV bays is to make the bays impossible to miss and back them with clear terms. Use green…