EV Bay Marking

EV Bay Marking

Coloured Bay Infills

Full or part green infills using anti-slip coatings or thermoplastic, making EV bays unmistakable from a distance.

Free EV Bay Marking quote

No obligation. We only use your details to reply about this job.

Coloured Bay Infills — EV Bay Marking

What's involved

Infilling the whole bay, or a strip at the charger end, in green makes EV spaces visible from the car park entrance. Crews use either a two-part methyl methacrylate or epoxy anti-slip coating, or sprayed and screeded coloured thermoplastic. The surface is mechanically cleaned to remove oil and loose material, then primed if needed. Coatings are applied with rollers or squeegees, with anti-slip aggregate broadcast into the wet layer so the bay stays safe for pedestrians in the rain. Masking tape gives sharp edges against the surrounding surface and any white or green bay lines. Most MMA coatings cure in around an hour, while epoxy systems take longer and need warmer conditions. A full infill uses more material than an outline, so it costs more per bay, but it is far more effective on busy sites. Plan for bays to be closed for a few hours while the coating cures.

How we handle it

  1. Site review

    Send photos, a site plan and charger positions, or arrange a visit. The specialist checks surface type, bay sizes, kerbs and access, and confirms whether chargers are already installed or still planned.

  2. Marking plan and quote

    You receive a quote covering bay outlines, infills, symbols, text and any line removal. For larger sites, a layout drawing shows bay positions, numbering and routes for drivers and pedestrians.

  3. Scheduling

    Work is booked around opening hours and charger installation. Ideally markings go down after chargers and bollards are fitted, so bays line up with units and cables reach comfortably.

  4. Marking

    Bays are cleared, the surface cleaned and dried, and old lines removed if needed. Green lines, infills, symbols and text are applied, with anti-slip aggregate or glass beads as specified.

  5. Final check and handover

    The crew checks bay positions, symbol placement and finish with you. Bays can usually reopen once thermoplastic cools or coatings have cured, typically within a few hours at most.

Price guide

EV bay marking is usually priced per bay, with options for outline only, part infill or full infill, plus symbols and text. Small jobs carry a minimum charge to cover the crew and kit. Full coloured infills cost the most because of the coating material and preparation needed. These are typical UK guide prices for 2026.

  • Full green bay infill (anti-slip coating): £180–£350 per bay. Surface preparation, coloured coating and anti-slip aggregate for a standard bay.
  • Removal of old bay lines: £3–£8 per linear metre. Grinding or blasting old lines when converting standard bays to EV use.
  • Minimum charge for small jobs: from £300. Covers crew, boilers and materials for a small number of bays.

Questions about coloured bay infills

How long does EV bay marking take?

A handful of bays with outlines and symbols can be completed in one to three hours. Full infills take longer because coatings need preparation and curing time. Large charging hubs may take a night or two to complete.

What size should an EV charging bay be?

Most EV bays are the same size as standard bays, commonly 2.4 m by 4.8 m. Wider bays of around 2.7 m or more help drivers manage cables. Accessible charging bays need extra space for transfer, as set out in PAS 1899 guidance.

What should EV bay text say?

Common wording includes EV CHARGING ONLY, ELECTRIC VEHICLES ONLY or ELECTRIC VEHICLE CHARGING. Keep it short so it can be laid in elongated letters that read well from a car. Match the wording to your signage and parking terms.

Get a free ev bay marking quote

Tell us what you need and we'll come back with a clear price.

Request a quote