EV Bay Marking

EV Bay Marking

EV Symbols and Charging Text

Preformed thermoplastic plug symbols, car-and-plug logos and text such as EV CHARGING ONLY applied in the bay.

Free EV Bay Marking quote

No obligation. We only use your details to reply about this job.

EV Symbols and Charging Text — EV Bay Marking

What's involved

Symbols and text tell drivers exactly what a bay is for. Preformed thermoplastic EV symbols, usually a car with a plug or a plug outline, are placed in the centre or rear of the bay and fused to the surface with a gas torch, which bonds them firmly to asphalt and concrete. Text such as EV CHARGING ONLY or ELECTRIC VEHICLES ONLY is laid in elongated letters so it reads correctly from the driver's seat. Symbols come in white, green or other colours to suit your scheme, and can be set on a coloured background patch for extra contrast. Crews position symbols so they are not hidden by a parked car's bonnet and are visible from the approach. Each symbol takes around 15 minutes to apply. If your site enforces EV-only parking, combine markings with upright signs stating the terms, because markings alone may not be enough to support enforcement.

How we handle it

  1. Site review

    Send photos, a site plan and charger positions, or arrange a visit. The specialist checks surface type, bay sizes, kerbs and access, and confirms whether chargers are already installed or still planned.

  2. Marking plan and quote

    You receive a quote covering bay outlines, infills, symbols, text and any line removal. For larger sites, a layout drawing shows bay positions, numbering and routes for drivers and pedestrians.

  3. Scheduling

    Work is booked around opening hours and charger installation. Ideally markings go down after chargers and bollards are fitted, so bays line up with units and cables reach comfortably.

  4. Marking

    Bays are cleared, the surface cleaned and dried, and old lines removed if needed. Green lines, infills, symbols and text are applied, with anti-slip aggregate or glass beads as specified.

  5. Final check and handover

    The crew checks bay positions, symbol placement and finish with you. Bays can usually reopen once thermoplastic cools or coatings have cured, typically within a few hours at most.

Price guide

EV bay marking is usually priced per bay, with options for outline only, part infill or full infill, plus symbols and text. Small jobs carry a minimum charge to cover the crew and kit. Full coloured infills cost the most because of the coating material and preparation needed. These are typical UK guide prices for 2026.

  • Green bay outline (thermoplastic): £25–£50 per bay. Green lines with glass beads on sound asphalt; lower rates apply to larger numbers of bays.
  • Minimum charge for small jobs: from £300. Covers crew, boilers and materials for a small number of bays.
  • Removal of old bay lines: £3–£8 per linear metre. Grinding or blasting old lines when converting standard bays to EV use.

Questions about ev symbols and charging text

What colour are EV charging bays in the UK?

Green is the most widely used colour for EV charging bays in the UK, either as bay lines, a full infill or a coloured strip. There is no single legal colour requirement for private car parks, but green has become a recognised convention that drivers associate with charging.

What size should an EV charging bay be?

Most EV bays are the same size as standard bays, commonly 2.4 m by 4.8 m. Wider bays of around 2.7 m or more help drivers manage cables. Accessible charging bays need extra space for transfer, as set out in PAS 1899 guidance.

What is an accessible EV charging bay?

An accessible EV charging bay is wider, with a transfer zone, level surface and no kerb between the vehicle and charger, so disabled drivers can use it independently. The charger screen, socket and cable must also be within reach. PAS 1899:2022 gives detailed guidance.

Get a free ev bay marking quote

Tell us what you need and we'll come back with a clear price.

Request a quote