EV Bay Marking

EV Bay Marking

Green EV Bay Outlines

Bright green thermoplastic bay lines that instantly set EV charging spaces apart from standard white-lined bays.

Free EV Bay Marking quote

No obligation. We only use your details to reply about this job.

Green EV Bay Outlines — EV Bay Marking

What's involved

Green has become the colour most UK car parks use for EV charging spaces, so a green outline is the simplest way to make bays stand out. Crews melt green thermoplastic in a heated boiler and apply it by hand screed or extrusion machine, giving a line around 3 mm thick with glass beads dropped in for night visibility. Bays are usually set out at the same width as standard bays, or a little wider where cables must reach both sides of a vehicle. If the old white bay lines remain, crews either remove them or overlay the green so there is no confusion. The surface must be swept, dry and free of oil. A few bays can be outlined in an hour or two, and thermoplastic can be driven on almost as soon as it cools. Clear vehicles from the bays beforehand, and ideally mark after chargers are installed so positions line up.

How we handle it

  1. Site review

    Send photos, a site plan and charger positions, or arrange a visit. The specialist checks surface type, bay sizes, kerbs and access, and confirms whether chargers are already installed or still planned.

  2. Marking plan and quote

    You receive a quote covering bay outlines, infills, symbols, text and any line removal. For larger sites, a layout drawing shows bay positions, numbering and routes for drivers and pedestrians.

  3. Scheduling

    Work is booked around opening hours and charger installation. Ideally markings go down after chargers and bollards are fitted, so bays line up with units and cables reach comfortably.

  4. Marking

    Bays are cleared, the surface cleaned and dried, and old lines removed if needed. Green lines, infills, symbols and text are applied, with anti-slip aggregate or glass beads as specified.

  5. Final check and handover

    The crew checks bay positions, symbol placement and finish with you. Bays can usually reopen once thermoplastic cools or coatings have cured, typically within a few hours at most.

Price guide

EV bay marking is usually priced per bay, with options for outline only, part infill or full infill, plus symbols and text. Small jobs carry a minimum charge to cover the crew and kit. Full coloured infills cost the most because of the coating material and preparation needed. These are typical UK guide prices for 2026.

  • Minimum charge for small jobs: from £300. Covers crew, boilers and materials for a small number of bays.
  • Removal of old bay lines: £3–£8 per linear metre. Grinding or blasting old lines when converting standard bays to EV use.
  • Full green bay infill (anti-slip coating): £180–£350 per bay. Surface preparation, coloured coating and anti-slip aggregate for a standard bay.

Questions about green ev bay outlines

What is an accessible EV charging bay?

An accessible EV charging bay is wider, with a transfer zone, level surface and no kerb between the vehicle and charger, so disabled drivers can use it independently. The charger screen, socket and cable must also be within reach. PAS 1899:2022 gives detailed guidance.

What size should an EV charging bay be?

Most EV bays are the same size as standard bays, commonly 2.4 m by 4.8 m. Wider bays of around 2.7 m or more help drivers manage cables. Accessible charging bays need extra space for transfer, as set out in PAS 1899 guidance.

Should EV bays be marked before or after chargers are installed?

After is usually best. Once chargers and protective bollards are in place, the crew can position bays so cables reach comfortably and vehicles are not blocked. Marking first risks redoing lines if the charger position changes or trenching damages the surface.

Get a free ev bay marking quote

Tell us what you need and we'll come back with a clear price.

Request a quote